ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN ATIENZA STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 210
Potholes (bowl-shaped depression) 0.1645 sq. m 0.47 m 0.35 m 0.04 m 13.88563 120.9136
13.88566 120.9136
Diagonal crack 6 l.m 6 m 0.035 m 0.02 m 13.88542 120.9137
Rehab/S 50 13.88509 120.9139
Rehab/E 57 13.88486 120.914
68 13.88433 120.9143
Spalling 0.372 sq. m 3.1 m 0.12 m 0.05 m 79 13.88406 120.9146
Minor Wornout surface 251.1 sq. m Wornout/E 93 13.8836 120.9148
Rehab/S 102 13.88298 120.9152
Rehab/E 112 13.88289 120.9153
Minor wornout surface 306.9 sq. m 113 13.88269 120.9154
124 13.88246 120.9155
Scaling 55.8 sq. m Scaling/S 142 13.88193 120.9159
Scaling/E 144 13.88188 120.916
Popouts 27.9 sq. m 190 13.88264 120.9166
Major Scaling 27.9 sq. m 200 13.88033 120.917
Note: Legend: /S - Start
1. The data is surveyed last February 16, 2022. /E - End
2. The unit of measure l.m denotes linear meter.
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com